01-29-2013, 09:16 AM
0
Progress resumes! Got the table leg and although it's not fastened properly, it will be later today.
I have to stain the finished strip one more coat and shellack the the thing today. It'll get nailed on, touched up and set by this evening.
Electricity is Matt's dept. and he'll be finishing up the boxes and outlets you see exposed. The center hole under there is the media outlet. All kinds of networking shit goes in there. Then we put shelves up on each side of the window and one across the entire top of the room for some of the collectables I have from hockey games and stuff.
The instructions for the table leg cracked me up. It's a leg with 5 screws. All in pictures because IKEA thinks that's the international language.
This is the best part - I see, "If you're a retard and can't figure out what that screwdriver does, call IKEA for help."
I have to stain the finished strip one more coat and shellack the the thing today. It'll get nailed on, touched up and set by this evening.
Electricity is Matt's dept. and he'll be finishing up the boxes and outlets you see exposed. The center hole under there is the media outlet. All kinds of networking shit goes in there. Then we put shelves up on each side of the window and one across the entire top of the room for some of the collectables I have from hockey games and stuff.
The instructions for the table leg cracked me up. It's a leg with 5 screws. All in pictures because IKEA thinks that's the international language.
This is the best part - I see, "If you're a retard and can't figure out what that screwdriver does, call IKEA for help."
I have no idea what you're talking about so here's a bunny with a pancake on it's head









